Ready for mole #7

|

Now that we've had a break in the rain, moles are busy fixing collapsed runs. All this rain has caused erosion problems on some properties, including mine, where heavy runoff finds its way into a tunnel system and flows downhill, eroding the ground as it goes. I've got at least one more in the yard, evidenced by mound building and a "fixed" run. The harpoon trap is set and ready to go.

Victor harpoon mole trap set and ready to go

About this Entry

This page contains a single entry by Keith Hansen published on June 28, 2007 7:34 PM.

Texas A&M Horticulture Field Day was the previous entry in this blog.

Mosquito time is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Pages

Powered by Movable Type 4.1